| General specifications for 1200L brewery equipment | ||||
| No. | Name | Components | Capacity | Specification |
| 1 | Grain Milling Unit | Rolling Miller | 300~500kg/hr | Double roller |
| Power:1.5Kw | ||||
| Noise:45±3db | ||||
| 2 | Brewhouse Unit | Mash/Lauter tun | 1200L (total 1500L) | Side mounted grain outdoor with grain chute |
| Laser cutting V-wire False Bottom | ||||
| Kettle/Whirlpool Tun | 1200L (total1560L) | Steam heating | ||
| Tangential whirlpool inlet | ||||
| Sanitary leveling sight glass | ||||
| Hot water tank | 1200L (total1380L) | Sanitary leveling sight glass | ||
| Yeast feeder | 20L | Tri clamp aeration port with ball valve | ||
| Heat exchanger | 10M2(Effective area) | Completely 304 SS Corrugated plates | ||
| Pump | 3M3x2PCS | ABB, Sanitary SUS304, VFD control | ||
| Pipe and fittings | As design | completely SS304, Work Platform is included | ||
| 3 | Fermentation unit | Fermenter | 1200L or 2400L for option | Dimple cooling jacket on cone and bottom |
| Side manway | ||||
| Tri clamp CIP ball | ||||
| 60 degree cone bottom | ||||
| Perlick style full sanitary sampling valve | ||||
| Carbonation port and level tube for special request | ||||
| 4 | Filtration unit(optional) | Kieselguhr Filter | 500kg/hr | Power: 1.2kw |
| Filter Area: 1.1M2 | ||||
| SUS304 | ||||
| 5 | Bright beer tank | Bright beer tank | 1200L or 2400L for option | Dimple cooling jacket on cone and bottom |
| Level tube for checking | ||||
| Tri clamp CIP ball | ||||
| Side manway | ||||
| Perlick style full sanitary sampling valve | ||||
| Carbonation port with tri clmap carbonation stone | ||||
| 6 | Glycol Chilling Unit | Glycol Water Tank | 2500L(total 2750L) | Insulated conical top and sloped bottom |
| Chiller | 5HPx2PCS | Cooling Capacity: 11000Kcal/5HP | ||
| Installed Power:5.6kw | ||||
| Refrigerant: Freon R404A ,R410A | ||||
| Noise:70-80db | ||||
| Coperland compressor | ||||
| PPR pipe | As designed | Solenoid valves for glycol inlet to tanks are included | ||
| Glycol water pump | 3M3 | Sanitary SUS304, VFD control | ||
| 7 | Control unit | Brewing and fermetation process Controlling | Floor type | PLC control with touch screen for special |
| PC or mobile remote control for special request | ||||
| 8 | CIP | Caustic Tank | 100L | electric heating element inside, With bimetal thermometer |
| Sterilization Tank | 100L | H2O2 | ||
| Pump | 3M3 | ABB, VFD control | ||
| 9 | Keg cleaning | Double Station Keg Rinser | 40-60kegs/hr | Heating: Electric, Power: 15kw(steam for optional) |
| 10 | Keg filling | Single Station Keg Filler | 30-40kegs/hr | Input Power: 0.1 kw |
| 11 | Bottling line | 8 heads | 400-500 bottles/hr | Manual |
| 12 | Others | Option | Can be Customized | Auger System |
| Grain Case | ||||
| Grist Hydrator | ||||
| Piping flow panel for Brewhouse | ||||
| Brewhouse Separate PLC Controller | ||||